top of page


Commercial HVAC Chiller Restoration: How ETS Rebuilt a Failing Chiller System
ETS restored a severely neglected commercial HVAC chiller and commercial HVAC system in a 1960s UPS facility, replacing failed components, updating controls, and installing a new cooling tower to deliver stable, efficient 66°F cooling.

ETS
Sep 77 min read


Tridium Niagara Controls: 7 Reasons Industrial Facilities Are Moving to the JACE 9000
Industrial facilities need building controls that provide better visibility, flexibility, and room to grow. See how Tridium Niagara and the JACE 9000 can help modernize building automation, simplify JACE 8000 upgrades, improve troubleshooting, and give facility teams better insight into HVAC system performance.

ETS
Aug 318 min read


Walk In Cooler Replacement & Repair: Step-by-Step Look Into a Real Commercial Refrigeration Project
Engineered Temperature Solutions walks through a full commercial walk in cooler replacement—from diagnosing a failing condenser to installing and commissioning a brand-new evaporator and rooftop condensing unit. See how our technicians restore reliable cooling, protect inventory, and ensure long-term performance for businesses across Central Ohio.

ETS
Nov 18, 20254 min read


Setting the Standard for Cooling Tower Replacement in Central Ohio
When aging equipment can’t keep up, ETS steps in. See how our team replaced a 300-ton cooling tower with a 500-ton upgrade—proving why Central Ohio businesses trust us for large-scale HVAC projects, precision installations, and long-term performance.

ETS
Nov 12, 20254 min read
bottom of page
